Allt Domhain Wind Farm

Site Name 

Allt Domhain Wind Farm

Site Location

Approximately 6.1km east of Glenbarr and 8km west of Carradale

Proposed Turbine Height

200 - 230m

Proposed No. of Turbines

9

Approximate Installed Capacity

64.8MW

Planning Authority

Argyll and Bute Council

Status

Application submitted

Site Location

Project Description

The proposed Allt Domhain Wind Farm is located approximately 6.1km east of Glenbarr and 8km west of Carradale on the Kintyre peninsula.

An application to the Energy Consents Unit of the Scottish Government was submitted in July 2025.

Additional Information was submitted in August 2026.

Application and Consultation

Following the completion of the EIA Report, Energyfarm Allt Domhain Ltd submitted an application to the Energy Consents Unit of the Scottish Government (the responsible authority for all wind farms above 50MW) in June 2025 to install and operate a wind farm comprising 9 turbines.
Determination is currently underway, involving all relevant stakeholders. The application documentation relating to the above proposal is available to view on the ECU website at www.energyconsents.scot by:– clicking on the Search tab; then,
  • clicking on the Simple Search tab then typing Allt Domhain into the Search by Project Name box then clicking Go; then,
  • clicking on ECU00003231 and then clicking on the Documents tab then clicking the Application Documents tab.
Alternatively, all EIA documentation can also be viewed on this webpage.

If you have any queries about the project or would like to know more, please contact the project manager (craig.potter@energiekontor.com)

 

Further Environmental Information

As of August 2026, Further Environmental Information was submitted to Scottish Ministers, which includes information relating to an amended northern access proposal, amended wind turbine infrastructure, and associated information related to ornithology, ecology, hydrology, peat and landscape and visual matters.

The information can also be viewed on this website under Further Environmental Information or at www.energyconsents.scot under application reference ECU00003231.

Copies of the EIA Report may be obtained from Energiekontor’s Project Manager Craig Potter (email: craig.potter@energiekontor.com).

All previous representations received by Scottish Ministers in relation to the application remain valid.

Any new representations on the application may be submitted by email to the Scottish Government via representations@gov.scot; or by post to the Scottish Government, Energy Consents Unit, 4th Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow, G2 8LU, identifying the proposal and specifying the grounds for representation. The consultation will be open until 1st October 2026.

Written or emailed representations should be dated, clearly stating the name (in block capitals) and full postal address of those making representations. Emailed representations should also include the full return email address of those making representations. Only representations sent by email to representations@gov.scot will receive acknowledgement.

Heading Missing

Text goes here

Heading Missing

Text goes here

Public Exhibition - February 2025

  • The Proposed development
  • Allt Domhain - Ecology and Ornithology
  • Allt Domhain - Site Considerations
  • Allt Domhain - Built Environment
  • Allt Domhain - Aviation Lighting
  • Allt Domhain - ZTV
  • Allt Domhain - Construction and Transport
  • Community Benefits
  • Figure 1 - Zone of Theoretical Visibility
  • Figure 2 - Viewpoint Wirelines

Public Exhibition - May 2025

  • Previous Exhibition
  • Design Evolution
  • General Site Considerations
  • Access - Overview and Design
  • Access - Proposed Routes
  • Aviation Lighting
  • ZTV
  • Context and Next Steps
  • Cumulative Wind Farms within 45km
  • Photomontage - Arnicle Viewpoint
  • Photomontage - Glenbarr War Memorial
  • Photomontage - Kintyre Way near Loch na Naich
  • Photomontage - Deer Hill, Carradale
  • Photomontage - Kintyre Way near Lussa Loch
  • Photomontage - Carradale Point
  • Photomontage - Imachar, Arran
  • Photomontage - Mullach Buidhe, Arran
  • ZTV (50,000 scale)

EIA Report and Planning Documents

  • EIA Volume 1 Written Statement
  • EIA Volume 2 Figures - Part 1
  • EIA Volume 2 Figures - Part 2
  • EIA Volume 3 Visualisations
  • EIA Volume 4 Technical Appendices
  • Planning Statement
  • Design and Access Statement
  • PAC Report
  • EIA Non-Technical Summary
  • Allt Domhain Advert
  • TA6.5 Additional Wirelines

Further Environmental Information - August 2026

  • FEI Volume 1 Chapter 1Introduction
  • FEI Volume 1 Chapter 2 FEI Approach
  • FEI Volume 1 Chapter 3 Project Description
  • FEI Volume 1 Chapter 4 Design Evolution
  • FEI Volume 1 Chapter 6 LVIA
  • FEI Volume 1 Chapter 7 Ecology
  • FEI Volume 1 Chapter 8 Ornithology
  • FEI Volume 1 Chapter 9 Hydrology Geology and Peat
  • FEI Volume 1 Chapter 14 Other Issues
  • FEI Volume 2 Figure 3.1c Northern Access Route Amendments
  • FEI Volume 2 Figure 3.1d Updated Infrastructure
  • FEI Volume 2 Figure 3.1e Comparative Infrastructure
  • FEI Volume 2 Figure 6.4L Mullach Buidhe
  • FEI Volume 2 Figure 7.1 NVC
  • FEI Volume 2 Figure 7.2 NVC and Woodland
  • FEI Volume 2 Figure 7.3 UKhab Ancient Woodland
  • FEI Volume 2 Figure 7.7 Peatland Habitat Condition
  • FEI Volume 2 Figure 9.1 Superficial Geology
  • FEI Volume 2 Figure 9.2 Bedrock Geology
  • FEI Volume 2 Figure 9.3 Soils Mapping
  • FEI Volume 2 Figure 9.4a Regional Hydrogeology Superficial
  • FEi Volume 2 Figure 9.4b Regional Hydrogeology Bedrock
  • FEI Volume 2 Figure 9.5 Groundwater Vulnerability
  • FEI Volume 2 Figure 9.6 Hydrological Features
  • FEI Volume 2 Figure 9.7 PWS
  • FEI Volume 4 Technical Appendix 3.1 Grid Connection Appraisal
  • FEI Volume 2 Figure 3.12 Barr Water Crossing
  • FEI Volume 4 Technical Appendix 8.4 Ornithology Report
  • FEI Volume 4 Technical Appendix 8.4 Figures
  • FEI Volume 4 Technical Appendix 8.6 Amended CRM
  • FEI Volume 4 Redacted Confidential Technical Appendix 8.5
  • FEI Volume 4 Technical Appendix 9.1 Water Crossing Schedule
  • FEI Volume 4 Technical Appendix 9.2 Outline PMP
  • FEI Volume 4 Technical Appendix 9.3 Outline PSRA
  • FEI Volume 4 Technical Appendix 9.4 Hydraulic Modelling
  • FEI Statutory Advert
  • FEI Volume 4 Technical Appendix 3.1 figures
  • FEI Volume 4 Technical Appendix 14.2 Updated Carbon Calculator

Heading Missing

Heading Missing

Heading Missing

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
© 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.