Mid Moile Wind Farm

Site Name 

Mid Moile

Site Location

2km east of Cairnryan

Proposed Turbine Height

Up to 230m

Proposed No. of Turbines

15

Approximate Installed Capacity

99.4 MW

Planning Authority

Dumfries and Galloway Council

Status

Consented

Site Location

Mid Moile site location map

Project Description

Energiekontor submitted an application to the Scottish Government Energy Consents Unit (ECU) under Section 36 of the Electricity Act 1989 which seeks consent to construct and operate a wind farm on land approximately 2km east of Cairnryan in Dumfries and Galloway. The proposed wind farm has a generating capacity of around 99 MW, comprising 15 wind turbines with a ground to blade tip height of between 200 and 230 metres and associated infrastructure.

Copies of the full Section 36 application documents are available to download below. If you have any questions on the proposal or would like any further information, please contact duncan.taylor@energiekontor.com.

Additional Information

In relation to the application submitted by Energiekontor UK Limited on 26 January 2022 for consent under section 36 of the Electricity Act 1989 to construct and operate the Mid Moile Wind Farm located approximately 2km east of Cairnryan within the planning authority area of Dumfries and Galloway Council, Additional Information has been submitted to the Scottish Government’s Energy Consents Unit.  This Additional Information relates to a partial redesign relating to landscape and visual, cultural heritage and hydrology effects. The Additional Information documents are available for viewing below.

Copies of the additional information and the application are available for public inspection in person, free of charge, during normal office hours at Dumfries and Galloway Council, English Street, Dumfries, DG1 2DD.

The additional information can also be viewed on the Scottish Governments Energy Consents Unit (“ECU”) website at www.energyconsents.scot under application reference ECU00003405. The ECU will be initiating the mandatory consultation which is required when Additional Information is submitted.

Additional Information – January 2024

In relation to the application submitted by Energiekontor UK Limited on 26 January 2022 for consent under section 36 of the Electricity Act 1989 to construct and operate the Mid Moile Wind Farm located approximately 2km east of Cairnryan within the planning authority area of Dumfries and Galloway Council, Additional Information has been submitted to the Scottish Government’s Energy Consents Unit.  This Additional Information relates to further information to address consultee comments relating to peat.  Additional information is also provided for an alternative layout comprising 14 turbines with a tip height of 200m. The Additional Information documents are available on this page for viewing.

Copies of the additional information and the application are available for public inspection in person, free of charge, during normal office hours at:

Dumfries and Galloway Council, English Street, Dumfries, DG1 2DD.

The additional information can also be viewed on the Scottish Governments Energy Consents Unit (“ECU”) website at www.energyconsents.scot under application reference ECU00003405. The ECU will be initiating the mandatory consultation which is required when Additional Information is submitted.

Heading Missing

Text goes here

Heading Missing

Text goes here

Planning Application

  • Design and Access Statement
  • Non-Technical Summary
  • Planning Statement
  • Public Notice
  • Volume 1 - Contents
  • Volume 2 - Contents
  • Volume 3 - Contents

Volume 1

  • Chapter 01: Introduction
  • Chapter 02 Approach to the Environmental Impact Assessment
  • Chapter 03: Project Description and Construction Methods
  • Chapter 04: Design Evolution
  • Chapter 05: Renewable Energy and Planning Policy
  • Chapter 06: Landscape and Visual
  • Chapter 07: Cultural Heritage and Archaeology
  • Chapter 08: Ornithology
  • Chapter 09: Ecology
  • Chapter 10: Noise
  • Chapter 11: Traffic and Transportation
  • Chapter 12: Hydrology, Hydrogeology and Geology
  • Chapter 13: Forestry
  • Chapter 14: Infrastructure and Human Health
  • Chapter 15: Socio-Economic Statement

Volume 2

  • Fig 1.1: Site Location Plan
  • Fig 3.10: Typical Substation Floor and Roof Plan
  • Fig 3.1: Site Layout Plan
  • Fig 3.1a: (1,2,3) A77 access
  • Fig 3.2a: Typical Turbine Elevation (200m to tip)
  • Fig 3.2b: Typical Turbine Elevation (230m to tip)
  • Fig 3.3: Typical Turbine Foundations
  • Fig 3.4: Typical Track Cross Sections
  • Fig 3.5: Typical Watercourse Crossing
  • Fig 3.6: Typical Construction Compound
  • Fig 3.7: Typical Crane Hardstanding
  • Fig 3.8: Typical Cable Trench Design
  • Fig 3.9: Typical Substation Elevations
  • Fig 4.1: First Layout Iteration
  • Fig 4.2: Second Layout Iteration
  • Fig 4.3: Third Layout Iteration
  • Fig 6.10: Landscape Character and Existing Light Environment
  • Fig 6.11: Zone of Theoretical Visibility – Visible Aviation Lighting – Tower Lights
  • Fig 6.12: Zone of Theoretical Visibility – Visible Aviation Lighting – Hub Lights
  • Fig 6.1: Landscape Context
  • Fig 6.2: Landscape Character
  • Fig 6.3: Topography
  • Fig 6.4: Visual Receptors
  • Fig 6.5: Screening ZTV Hub and Tip 20km
  • Fig 6.6: Zone of Theoretical Visibility (ZTV)
  • Fig 6.7: Cumulative Base Plan
  • Fig 6.8: Cumulative ZTV – Operational and Consented Sites
  • Fig 6.9: Cumulative ZTV – Glen App
  • Fig 7.10: CHVP9 Long Tom, Standing Stone, Mildown
  • Fig 7.11: CHVP10 Claywarnies
  • Fig 7.12: CHVP12 Fairy Knowes Hut Circle
  • Fig 7.13: CHVP7 Awles Hut Circle
  • Fig 7.14: CHVP14 Old Hall
  • Fig 7.15: CHVP15 Craigcaffle Tower
  • Fig 7.1: Known Heritage Assets within Inner Study Area (ISA)
  • Fig 7.2: Known Heritage Assets within Outer Study Area (OSA)
  • Fig 7.3: Cultural Heritage Viewpoints (CHVP) Locations
  • Fig 7.4: ZTV Lochryan
  • Fig 7.5: CHVP1 Lochryan GDL
  • Fig 7.6: ZTV Castle Kennedy
  • Fig 7.7: CHVP3 Castle Kennedy
  • Fig 7.8: CHVP8 Brockloch Cairn, Cairn Hill
  • Fig 7.9: CHVP13 Brockloch, Cairn, Cairn Hill (Wireframe)
  • Fig 9.1: Site Location and Designated Sites
  • Fig 9.2: Illustrate Turbine Layout
  • Fig 9.3: Phase 1 Habitat Survey Results
  • Fig 9.4: Protected Species Survey Results
  • Fig 9.5: NVC Survey Results
  • Fig 9.6: GWDTE Survey Results
  • Figure 11.1: Study Area
  • Fig 11.2: Traffic Counter Locations
  • Fig 11.3: Abnormal Loads Route
  • Fig 12.1: Hydrology Overview
  • Fig 12.2: Private Water Supplies
  • Fig 12.3: Solid Geology
  • Fig 12.4: Superficial Geology
  • Fig 12.5: Interpolated Peat Depth
  • Fig 12.6: Predominant Soils
  • Fig 12.7: Carbon and Peatland
  • Fig 13.1: Loch Ree Forest Compartment Plan
  • Fig 13.2: Felling for Infrastructure
  • Fig 13.4: Restocking of Management Felling Areas
  • Fig 13:3: Management Felling
  • Viewpoint 01: Ayrshire Coastal Path
  • Viewpoint 02: Loch Ryan Coastal Path
  • Viewpoint 03: A77 at Cairnryan
  • Viewpoint 04: Kirkcolm
  • Viewpoint 05: Leswalt
  • Viewpoint 06: Stranraer
  • Viewpoint 07: A77 south of site
  • Viewpoint 08: Castle Kennedy
  • Viewpoint 09: A716 near Sandhead
  • Viewpoint 10: A747 near Glenluce
  • Viewpoint 11: New Luce
  • Viewpoint 12: Southern Upland Way near Kilhern Caves
  • Viewpoint 13: Penwhirn Reservoir
  • Viewpoint 14: Carlock Hill
  • Viewpoint 15: Beneraid
  • Viewpoint 16: Larne/Belfast Ferry Route

Volume 3

  • Chapter 01: Technical Appendices
  • Chapter 03: Technical Appendices
  • Chapter 06: Technical Appendices
  • Chapter 07: Technical Appendices
  • Chapter 09: Technical Appendices - part 1
  • Chapter 09: Technical Appendices - part 2
  • Chapter 10: Technical Appendices
  • Chapter 11: Technical Appendices - Part 1
  • Chapter 11: Technical Appendices - Part 2
  • Chapter 13: Technical Appendices

Additional Documents

  • AI Vol II Figure 6.1 - Landscape Context A3
  • AI Vol II Figure 6.10 - Landscape Character and Existing Light Environment A1
  • AI Vol II Figure 6.12 - ZTV - Visible Aviation Lighting - Hub Heights A1
  • AI Vol II Figure 6.2 - Landscape Character A3
  • AI Vol II Figure 6.3 - Topography A3
  • AI Vol II Figure 6.4 - Visual Receptors A3
  • AI Vol II Figure 6.5 - Screening ZTV Hub and Tip A1
  • AI Vol II Figure 6.6 - Bare Ground ZTV 45km A1
  • AI Vol II Figure 6.7 - Cumulative Base Plan A3
  • AI Vol II Figure 6.8 - Cumulative ZTV Operational and Consented Sites A1
  • AI Vol II Figure 6.9 - Cumulative ZTV Glen App A1
  • AI Vol II Figure 7.1 - Known Heritage Assets within the Site Boundary and 1km Study Area
  • AI Vol II Figure 7.10 - CHVP9 Long Tom Standing Stone
  • AI Vol II Figure 7.11 - CHVP10 Claywarnies Cairn
  • AI Vol II Figure 7.12 - CHVP12 Fairy Knowes Hut Circle
  • AI Vol II Figure 7.13 - CHVP7 Awies Hut Circle
  • AI Vol II Figure 7.14 - CHVP14 Old Hall
  • AI Vol II Figure 7.15 - CHVP15 Craigcaffie Tower
  • AI Vol II Figure 7.2 - Known Heritage Assets within Outer Study Area OSA and Bare Earth ZTV
  • AI Vol II Figure 7.3 - Cultural Heritage Viewpoint CHVP Locations
  • AI Vol II Figure 7.4 - High Resolution 5m Bare Earth DTM ZTV for Lochryan
  • AI Vol II Figure 7.5 - High Resolution 5m DSM ZTV for Castle Kennedy
  • AI Vol II Figure 7.6 - CHVP1 Lochryan GDL
  • AI Vol II Figure 7.7 - CHVP3 Castle Kennedy GDL
  • AI Vol II Figure 7.8 - CHVP8 Brochloch Cairn
  • AI Vol II Figure 7.9 - CHVP13 Brockloch Cairn
  • AI Vol II Figure 9.1 - Revised Turbine Locations and Survey Areas
  • AI Vol II Figure 9.2 - Updated Ecological Constraints Survey Results
  • AI Vol II Figure 12.1 - Hydrology Overview
  • AI Vol II Figure 13.1 - Loch Ree Forest Compartment Schedule 2023
  • AI Vol II Figure 13.2 - Loch Ree Forest Compartment Schedule 2025
  • AI Vol II Figure 13.3 - Felling Long Term Forest Plan
  • AI Vol II Figure 13.4 - Management Felling Around Infrastructure
  • AI Vol II Figure 13.5 - Restocking in Management Felling Areas
  • AI Vol II Viewpoint 1 - Ayrshire Coastal Path
  • AI Vol II Viewpoint 2 - Loch Ryan Coastal Path
  • AI Vol II Viewpoint 3 - A77 at Cairnryan
  • AI Vol II Viewpoint 4 - Kirkcolm
  • AI Vol II Viewpoint 5 - Leswalt
  • AI Vol II Viewpoint 6 - Stranraer
  • AI Vol II Viewpoint 7 - A77 South of Site
  • AI Vol II Viewpoint 12 - Southern Upland Way near Kilhem Results
  • AI Vol II Viewpoint 13 - Penwhirn Reservoir
  • AI Vol II Viewpoint 14 - Carlock Hill
  • AI Vol II Viewpoint 15 - Beneraird
  • AI Vol II Viewpoint 16 - Larne Belfast Ferry Route.pdf
  • AL Vol III Appendix 6.4 - Viewpoint Analysis
  • AL Vol III Appendix 6.5 - Residential Amenity Assessment.pdf
  • AI Vol III Appendix 12.3 - Peat Slide Risk Assessment 1_Part1
  • AI Vol III Appendix 12.3 - Peat Slide Risk Assessment 1_Part2
  • AI Vol III Appendix 13.1 - Forestry compartment schedule 2023
  • AI Vol III Appendix 13.2 - Forestry compartment schedule 2025
  • AI Vol III Appendix 13.3 - Long Term Forest Plan
  • AI Vol III Appendix 13.4 - Forestry Waste Plan
  • AI Vol III Appendix 14.1 - Lighting Report
  • Appendix 10.1 - Noise Contour Plots.pdf
  • Mid Moile Additional Information Volume I
  • Sub Appendix 1 Known Heritage Assets Within The Study Area
  • Public Notice

Further Additional Documents

  • Additional Information
  • Additional Information Appendix 1
  • Additional Information Appendix 2
  • Additional Information Appendix 3
  • Public Notice

Notice of Decision

  • Notice of Decision

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
© 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.