Strath Oykel Wind Farm

Site NameΒ 

Strath Oykel Wind Farm

Site Location

Approximately 1.5km east of Doune, within the Strath Oykel Forest

Proposed Turbine Height

200m

Proposed No. of Turbines

11 Turbines

Approximate Installed Capacity

Up to72.6MW + 5MW Battery Storage

Planning Authority

Section 36 application within The Highland Council

Status

Consented

Site Location

Strath Oykel site location map

Project Description

Strath Oykel Wind Farm is located approximately 1.5km south east of Doune, in the Sutherland region of the Highlands. The proposed development comprises 11 turbines up to 200m to tip.

A description of the development can be found in the Non-Technical Summary (NTS) which is available to view on this page.

Copies of the full EIA Report and its associated standalone documents can be found on the Energy Consents Unit website with details on how to view these documents set out below.

Alternatively, the Project Manager can be contacted, as appropriate. There is no charge for provision of electronic documents or hard copies of the Non-Technical Summary on request. The Project Manager is available to discuss the project viaΒ calum.morris@energiekontor.com.

Project Update - January 2025

Planning Permission for the proposed development was consented in January 2025 by Scottish Ministers:

https://www.energyconsents.scot/ApplicationDetails.aspx?cr=ECU00003246

 

Heading Missing

Text goes here

Heading Missing

Text goes here

Heading Missing

Text goes here

EIA Documents

  • Design and Access Statement
  • Layout Plan
  • Non-Technical Summary
  • Planning Statement
  • PDF title

Scoping Documents

  • EIA Scoping Report
  • Fig 3.1 Site Location Plan
  • Fig 4.2 Scoping Layout

Public Exhibition May 2021

  • 01 Welcome
  • 02 About EnergieKontor
  • 03 Proposed Development
  • 04 Why Wind Power
  • 05 Built Environment
  • 06 Ecology
  • 07 Aviation
  • 08 Site Consideration
  • 09 ZTV Stage 45km
  • 10 Visual Assessment
  • 11 Construction and Transport
  • 12 EIA Overview
  • 13 Thank You
  • Public Engagement Questionnaire

Second Exhibition December 2021

  • 01 Welcome
  • 02 Proposed Development
  • 03 Ecology
  • 04 Built Environment
  • 05 Aviation and Telecoms
  • 06 Peat
  • 07 LVIA
  • 08 About EnergieKontor
  • 10 EIA Overview
  • 11 Thank You
  • 12 ZTV 45km
  • 13 Wirelines

Third Exhibition April 2022

  • VP1 A837 near Tuiteam
  • VP2 Rosehall
  • VP3 Altass
  • VP4 A837 Oykel Bridge
  • VP5 Achnahanat
  • VP6 Crn a Choin Deirg
  • VP7 A839 Rosehall Lairg
  • VP8 Lower Brae

Decision Notice

  • Notice of Decision
  • Decision Letter

Heading Missing

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
Β© 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.