Skip to content
  • info@energiekontor.co.uk
EnergieKontor logo
  • About Us
  • PPAs
  • Renewable Energy
  • Development Process
  • Landowners
  • Projects
  • Contact
  • About Us
  • PPAs
  • Renewable Energy
  • Development Process
  • Landowners
  • Projects
  • Contact

Divot Hill Wind Farm

Site NameΒ 

Divot Hill

Site Location

Approximately 7 km north east of St John’s Town of Dalry

Proposed Turbine Height

Up to 200m

Proposed No. of Turbines

Up to 9

Approximate Installed Capacity

Up to 50MW

Planning Authority

Dumfries and Galloway Council

Status

Application Submitted (ref 23/0368/FUL)

Site Location

Divot Hill site location map

Project Description

This project is at the early stages of development; an initial layout of up to 9 turbines with tip heights up to 200m has been prepared for the purposes of consulting with the local community and other key stakeholders. The Site sits adjacent to the consented Margree and Glenshimmeroch wind farms and would share certain infrastructure elements with them, such as site accesses and internal tracks. Assessment of the technical, environmental and commercial constraints of the Site is currently ongoing and will inform the final design of the wind farm. An Environmental Impact Assessment Report for Divot Hill is currently underway and will be submitted with the planning application.

Public Consultation

EnergieKontor are currently consulting with members of the public on the proposed site layout. Due to the ongoing COVID-19 crisis we are conducting this public consultation through other means, including online, in the interest of public safety and to reflect temporary guidance and legislation changes affecting public consultation in Scotland.Β  The downloadable documents on this page contain the consultation material that we would have presented at a public exhibition and will continue to be updated as the project progresses. We would be grateful for any comments on our proposals, and these can be sent directly to the project manager either in an email to Michaela Corbett atΒ michaela.corbett@energiekontor.com, or through completing the online questionnaire.

To take a short survey and leave your contact details to be kept updated on ongoing progress please clickΒ here.

Heading Missing

Text goes here

Heading Missing

Text goes here

Heading Missing

Text goes here

Public Exhibition Documents

  • Community Benefits
  • Cumulative Development
  • PM A702 Corriedoo
  • PM A702 Moss Roddock Loch
  • PM Minor Road Auchenshinnoch
  • PM Minor Road Bogue Moor
  • PM SUW Waterside Hill
  • Proposed Development
  • ZTV

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
Β© 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.