Herd Hill Wind Farm

Site NameΒ 

Herd Hill

Site Location

Located immediately north of Loch Finlas and approximately 1.5km west of Loch Doon

Proposed Turbine Height

200m

Proposed No. of Turbines

12

Approximate Installed Capacity

79.2 MW

Planning Authority

East Ayrshire Council; South Ayrshire Council

Status

Scoping (Pre-application)

Site Location

Project Description

ECU Reference: ECU00006175

The proposal would comprise of up to 12 turbines with a maximum tip height of 200m and a generating capacity of up to 79.2 MW, along with associated infrastructure. The Site would have an operation lifespan of 35 years, after which the Site will be decommissioned.

The Site is centred at approximately OS Grid Reference 245925, 599350, located immediately north of Loch Finlas and approximately 1.5km west of Loch Doon. The topography of the site is undulating. The application site comprising of upland moorland, with a small number of areas of woodland. The Site is principally used for grazing.

There are a number of wind farms, either operational, approved or within the planning system, within the surrounding area. Most notable of these are the operational Dersalloch Wind Farm, with 23 turbines up to 125m to tip located approximately 4.5km north-west of the Site and the operational South Kyle Wind Farm which is located approximately 8km north-east of the Site and comprises 50 turbines at 150m m to tip. Benbrack Wind Farm, currently under construction, is located approximately 7km east of the Site and comprises 15 turbines up to 150m to tip.

Heading Missing

Text goes here

Heading Missing

Text goes here

Heading Missing

Text goes here

Heading Missing

Text goes here

Scoping Documents

  • Site Location
  • Proposed Layout
  • ZTV to Blade Tip and proposed LVIA Viewpoints - 20km
  • ZTV to Hub and proposed LVIA Viewpoints - 20km
  • ZTV to Blade Tip and proposed LVIA Viewpoints - 45km
  • Herd Hill Scoping Report
  • ECU Scoping Opinion

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
Β© 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.