Site NameΒ
Lairg II
Site Location
Land at Leathad Creagach and Ruigh na Cup, approximately 4km southeast of Lairg, Sutherland.
Proposed Turbine Height
5 x turbines up to 200m, 2 x turbines up to 190m, and 3 x turbines up to 150m
Proposed No. of Turbines
10
Approximate Installed Capacity
49.9 MW
Planning Authority
The Highland Council
Status
Consented October 2021
The site is located approximately 800m south of the existing 3 turbine (100m tip height) Lairg Wind Farm on land at Leathad Creagach and Ruigh na Cup, approximately 4km southeast of Lairg, Sutherland. In October 2021 a tip height increase for Lairg II Wind Farm was consented by The Highland Council. The consent is comprised of a 10-turbine scheme, with 5 turbines up to 200m tip height, 2 turbines up to 190m tip height, and 3 turbines up to 150m tip height.
EnergieKontor is progressing with pre-commencement of construction activities and the finalisation of detailed designs.