Skip to content
  • info@energiekontor.co.uk
EnergieKontor logo
  • About Us
  • PPAs
  • Renewable Energy
  • Development Process
  • Landowners
  • Projects
  • Contact
  • About Us
  • PPAs
  • Renewable Energy
  • Development Process
  • Landowners
  • Projects
  • Contact

New Rides Solar Farm

Site Nameย 

New Rides Solar Farm

Site Location

Approximately 1km south of Eastchurch, Isle of Sheppey, Kent

Proposed Turbine Height

Approximately 12.3 ha

Proposed No. of Turbines

N/A

Approximate Installed Capacity

10MWp

Planning Authority

Swale Borough Council

Status

Planning Application submitted (ref: 21/503240/FULL)

Site Location

New Rides site location map

Project Description

Energiekontor are proposing a solar farm within the site of our operational New Rides Wind Farm, on the Isle of Sheppey. The solar panels are to be located on approximately 12.3 ha of agricultural land and have an approximate installed capacity of 10MWp. Energiekontor, with the support of specialist consultants, have prepared a suite of environmental, technical and planning information for the proposed solar farm. This information forms part of the planning application which has been submitted to Swale Borough Council for determination.

Screening

Energiekontor submitted an Environmental Impact Assessment (EIA) Screening Request to Swale Borough Council in August 2020 for an initial layout. The local authority responded with their EIA Screening Opinion in September 2020 and concluded that the project is not likely to result in significant environmental effects, therefore is not considered EIA development and an Environmental Statement is not required.

Public Engagement

Due to restrictions on public gatherings due to COVID-19, public consultation has been conducted through other means, including online. Information submitted as part of the Planning Application is available to download on this page or from theย Councilโ€™s planning portal. Should you have any comments on the application these can be made either directly to the Project Manager, Fred Brown atย Fred.Brown@energiekontor.comย (we will aim to respond with 48 hours) or via the Councilโ€™s planning portal.

Heading Missing

Text goes here

Heading Missing

Text goes here

Site Plans

  • Existing Site Layout
  • Proposed Site Layout
  • Proposed Site Layout with Access
  • Site Location
  • Typical CCTV
  • Typical Panel Details
  • Typical Security Fence
  • Typical Transformer

EIA Screening

  • EIA Screening Opinion
  • EIA Screening Response

Planning Application

  • Agricultural Land Classification Report
  • Archaeological Desk Based Assessment
  • Design and Access Statement
  • Ecological Assessment Report
  • Flood Risk Assessment and Drainage Statement
  • Glint and Glare Study
  • Landscape and Visual Assessment
  • Planning and Energy Statement
  • Statement of Community Involvement

Heading Missing

Heading Missing

Heading Missing

Heading Missing

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
ยฉ 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.