Craiginmoddie Wind Farm

Site NameΒ 

Craiginmoddie

Site Location

4km south of Dailly

Proposed Turbine Height

Up to 200m

Proposed No. of Turbines

14

Approximate Installed Capacity

92.4 MW

Planning Authority

South Ayrshire Council

Status

Consented

Site Location

Craiginmoddie site location map

Project Description

Energiekontor submitted an application which was consented in November 2025 by the Scottish Government Energy Consents Unit (ECU) under Section 36 of the Electricity Act 1989. The wind farm will have a generating capacity of around 92.4MW, comprising 14 wind turbines with a ground to blade tip height of up to 200 metres and associated infrastructure. The proposal also includes provision for around 7 MW of energy storage output capacity.

Heading Missing

Text goes here

Heading Missing

Text goes here

Heading Missing

Text goes here

Heading Missing

Text goes here

Project Documents

  • Notice of Decision
  • Report
  • Appendix 1
  • Appendix 2 (part 1)
  • Appendix 2 (part 2)
  • Appendix 2 (part 3)
  • Appendix 3 (part 1)
  • Appendix 3 (part 2)
  • Appendix 4
  • Appendix 5
  • Public Notice
  • Vol 2 - Main Report
  • Vol 2 - Appendix 1.1: Peat Landslide Risk Assessment Stage 3
  • Vol 2 - Appendix 1.2: CAA Approval of Reduced Lighting Scheme
  • Vol 2 - Appendix 2.1: Peat Stability Risk Assessment (part 1)
  • Vol 2 - Appendix 2.1: Peat Stability Risk Assessment (part 2)
  • Vol 2 - Appendix 2.2: Peat Management Plan
  • Vol 3 - Annex 1: LVIA
  • Vol 3 - Appendix 1: Contents
  • Vol 3 - Appendix 1: Cumulative Wireframes
  • Vol 3 - Appendix 1: Fig 1 to 12
  • Vol 3 - Appendix 1: Fig 13 to 16
  • Vol 3 - Appendix 1: Fig 17 to 20
  • Vol 3 - Appendix 2: Updated Aviation Lighting Report
  • Vol 3 - Appendix 3: Visible Aviation Lighting Plan
  • Vol 3 - Appendix 4: Turbine Lighting Intensity Plan
  • Vol 3 - Appendix 5: VP3 Night Photomontage
  • Vol 3 - Appendix 5: VP9 Night Photomontage
  • Vol 3 - Appendix 5: VP10 Night Photomontage
  • Vol 3 - Appendix 6: Corphin Cumulative Photomontage
  • Vol 3 - Appendix 6: Delamford Cumulative Photomontage
  • Vol 3 - Appendix 6: Dobbingston Cumulative Photomontage
  • Vol 3 - Appendix 6: Knockrochar Cumulative Photomontage
  • Vol 3 - Main Report
  • Vol 4 - Operational Noise Report (March 2023)

Environmental Impact Assessment Report - Volume I: Main Text

  • Covers and Contents
  • Chapter 1 - Introduction
  • Chapter 2 - Approach to the EIA
  • Chapter 3 - Project Description and Construction Methods
  • Chapter 4 - Design Evolution
  • Chapter 5 - Renewable Energy and Planning Policy
  • Chapter 6 - Landscape and Visual
  • Chapter 7 - Cultural Heritage and Archeology
  • Chapter 8 - Ornithology
  • Chapter 9 - Ecology
  • Chapter 10 - Noise
  • Chapter 11 - Traffic and Transportation
  • Chapter 12 - Hydrogeology and Geology
  • Chapter 13 - Forestry
  • Chapter 14 - Infrastructure and Human Health
  • Chapter 15 - Socio-economic Statement

Environmental Impact Assessment Report - Volume II: Figures and Visualisations

  • Covers and Contents
  • Chapter 1
  • Chapter 3
  • Chapter 4
  • Chapter 6.1 - 6.4
  • Chapter 6.5 - 6.8
  • Chapter 6.9 - 6.12
  • Chapter 7.1 - 7.4
  • Chapter 7.5 - 7.10
  • Chapter 8
  • Chapter 9
  • Chapter 10
  • Chapter 11
  • Chapter 12.1 - 12.4
  • Chapter 12.5 - 12.8
  • Chapter 13
  • Viewpoint 1 - South Balloch
  • Viewpoint 2 - Hadyard Hill
  • Viewpoint 3 - Dailly
  • Viewpoint 4 - B741 near Ruglen
  • Viewpoint 5 - Barr
  • Viewpoint 6 - Crosshill
  • Viewpoint 7 - Colonel Hunter Blair Monument Kildoach Hill
  • Viewpoint 8 - North Threave
  • Viewpoint 9 - Cornish Hill
  • Viewpoint 10 - B734 near Cairnwhin
  • Viewpoint 11 - Maybole War Memorial
  • Viewpoint 12 - Shalloch on Minnoch
  • Viewpoint 13 - A77 North of Girvan
  • Viewpoint 14 - Byne Hill
  • Viewpoint 15 - Merrick
  • Viewpoint 16 - Cairnsmore of Carsphairn
  • Additional Wirelines A - J

Environmental Impact Assessment Report - Volume III: Technical Appendices

  • Covers and Contents
  • Chapter 1
  • Chapter 3
  • Chapter 6.1 - 6.6
  • Chapter 6.7 - 6.8
  • Chapter 8
  • Chapter 9.1 - 9.2
  • Chapter 9.3 - 9.4
  • Chapter 11
  • Chapter 12.1 - 12.2
  • Chapter 12.3

Environmental Impact Assessment Report - Volume IV: Non-Technical Summary

  • Non-Technical Suammary

Other Application Documents

  • Planning Statement
  • Design and Access Statement
  • Application S36 Advertisement

Heading Missing

Heading Missing

EnergieKontor logo
  • Disclaimer
  • Privacy Policy

Leeds

4330 Park Approach
Thorpe Park
Leeds
LS15 8GB

  • info@energiekontor.co.uk

Glasgow

44 Elliot Street
Glasgow
G3 8DZ

  • info@energiekontor.co.uk

Edinburgh

31 Dewar Place Lane
Edinburgh
EH3 8EF

  • info@energiekontor.co.uk
Β© 2026 EnergieKontor. All rights reserved | Website by Brookstone Creative Ltd.